| home page | photograph category | date built | architect or builder | date photographed | location map | all by name | all by date |
| previous photo | next photo | copyright |
| Description: Geat Northern Road: CyclePoint bike park: stairs |
| Date built: 2015-2016 |
| Architect: Formation Architects |
|
|
| Date photograph taken: 25 Mar 2017 | (Alternative map: Google map) |
Not surprisingly, the stairways inside the cycle building at the railway station are designed with grooves in the concrete to make it easy to wheel a bike up to and down from the various floors.
Other photographs within 200 m:
| previous photo | next photo | copyright |
| home page | photograph category | date built | architect or builder | date photographed | location map | all by name | all by date |