Cambridge 2000: Patagonia Way: Darwin Green Library

Description: Patagonia Way: Darwin Green Library
Date built: 2020-2023
Architect: Makower Architects
Patagonia Way: Darwin Green Library (Makower Architects) map for Patagonia Way: Darwin Green Library
Date photograph taken: 16 Jun 2024 (Alternative map: Google map)

The library is on the ground floor, with accommodation above. The building was completed in 2023 but in 2025 the library was still not opened.

Other photographs within 500 m: